Idiomas de Catalana de Perforacions
Catalana de Perforacions English
Catalana de Perforacions Español
Catalana de Perforacions Català

Catalana de Perforacions, S.A.

Vertical and Horizontal Directional Drilling

Vertical drillings for subterranean water harness and horizontal directional drilling. Georadar, HDD, Neodren, See water intake, Termography and Geology

Who we are
Who we are
Horizontal Directional Drillings
Vertical Drilling
Neodren
Ground Research
Company
Equipment
Map
Home
Contact
Web Map
1 Pilot Drilling
It is the first stage in the directional drilling. It consists of executing a borehole following the line previously designed. It can be possible the soil erosion by means of a head adapted to the ground features, injecting high-pressure drilling fluid, digging and removing the detritus, simultaneously, to the entry point. The pilot drilling may have turns on elevation plan, in order to avoid the existing utilities and obstacles, and to reach the planned exit point. Usually, two small pits are dug in the starting and exit point respectively, with the purpose of containing the drilling fluid, so as to be pumped and recirculated.