Horizontal Directional Drilling
Installation of a pipe for collector service
Date
20230313
Type of installation
Sanitation
Pipe
Drilling length
248 m
Soil
Alternation of sandstones and marlstones
Location
Urnieta
Drilling project of 248 metres and ø400mm diameter with the Horizontal Directional Drilling method to carry out the installation of a pipe for the service of a collector.
What is a manifold service?
The installation of a sewer focuses on a service for the transport of wastewater from homes and commercial buildings to a treatment or disposal plant.




