
Horizontal Directional Drilling
Installation of piping for the electricity service in Lleida

Date
20230313

Type of installation
Electricity

Pipe

Drilling length
29,5 m

Soil
Clays and gravels

Location
Mollerussa
Road crossing project for the installation of a pipeline in Lérida to provide electricity service.