Installation of piping for the electricity service in Lleida

Horizontal Directional Drilling

Horizontal Directional Drilling

Installation of piping for the electricity service in Lleida

Date

Date

20230313

Type of installation

Type of installation

Electricity

Pipe

Pipe

Drilling length

Drilling length

29,5 m

Soil

Soil

Clays and gravels

Location

Location

Mollerussa

Road crossing project for the installation of a pipeline in Lérida to provide electricity service.

FEATURED PROJECTS