Horizontal Directional Drilling
Installation of a sewage pipeline in Vizcaya, Spain
Date
20230313
Type of installation
Electricity
Pipe
Drilling length
173,50 m
Soil
Alternation of sandstones and marls, Marls and ophites and altered Quaternary
Location
Munitibar
Drilling project of 173.50 metres and 1x ø400mm+(1xø315mm) diameter using the Horizontal Directional Drilling method to carry out the installation of a pipeline for the sewage service in Vizcaya.

