Direct Pipe®
Marine Outfall Construction at the Os Praceres WWTP, Pontevedra
Date
April 2020
Type of installation
Immissary
Pipe
Drilling length
693 m
Soil
Clay, granite and sand
Location
Os Praceres, Pontevedra (Spain)
The drilling works were completed in just 24 days, achieving advance rates of up to 70 metres per day and culminating in a 690-metre bore with a 1,422 mm (56-inch) diameter
The expansion of the Os Praceres Wastewater Treatment Plant (WWTP) in Pontevedra included the construction of a new marine outfall, a key infrastructure project designed to improve the wastewater network and help protect the surrounding estuarine environment.
As part of this project, we were responsible for carrying out the drilling works using Direct Pipe® technology, a solution that enabled the pipeline to be installed from land to sea without the need for open-cut excavation along the coastline or any direct intervention on the seabed.
Our involvement formed part of the first Direct Pipe® project with an offshore exit ever completed in Spain, marking an important milestone in the application of trenchless technologies for hydraulic infrastructure.
690 metres in length, 1,422 mm in diameter
Our scope of work consisted of executing a 690-metre bore to install a 56-inch (1,422 mm) steel pipeline, from the entry point on the shoreline to the exit point located –6 metres beneath the seabed.
The drilling works were completed in 24 consecutive days, achieving drilling rates of up to 70 metres per day.
Throughout the entire alignment, we encountered particularly demanding ground conditions, comprising alternating layers of silts, clays and granite. These varying geological conditions required continuous adjustment of the drilling parameters and precise control of the bore path to ensure the successful installation of the pipeline.
Why was Direct Pipe® technology selected?
The project required the installation of a large-diameter pipeline while minimising the environmental impact and maintaining a high level of accuracy throughout the drilling process.
Direct Pipe® technology made it possible to excavate and simultaneously install the final pipeline in a single continuous operation, reducing the surface footprint and avoiding intervention along the coastline and on the seabed.
This methodology is particularly well suited to highly complex crossings beneath rivers, roads and railway infrastructure, as well as for land-to-sea connections, where precision and process control are critical to the success of the project.
A project that reflects our experience
Every project presents different challenges, and our commitment is to deliver the most appropriate drilling solution for each one.
Our involvement in the construction of the Os Praceres WWTP marine outfall represents one of the most significant projects completed using Direct Pipe® technology, demonstrating our ability to undertake large-diameter, long-distance drilling works in complex geological conditions.
Having contributed to the first Direct Pipe® project with an offshore exit in Spain reinforces our experience in trenchless technologies and our ability to work alongside engineering consultancies and contractors on projects where precision, planning and geological expertise are essential.
Preguntas Frecuentes
What was Catalana de Perforacions' role in the Os Praceres WWTP project?
Catalana de Perforacions was responsible for carrying out the drilling works using Direct Pipe® technology to install the new marine outfall for the Os Praceres Wastewater Treatment Plant (WWTP) in Pontevedra. Our scope included executing a 690-metre bore to install a 56-inch (1,422 mm) steel pipeline from land to sea.
What did Catalana de Perforacions contribute to this project?
Our contribution focused on delivering the drilling works within our area of expertise, using the most suitable technology and resources to meet the project’s technical requirements. We worked in close coordination with the client and the other project partners to ensure a precise, safe and technically compliant execution.
What makes this project unique?
This project formed part of the first Direct Pipe® installation with an offshore exit ever completed in Spain, representing a major milestone in the application of trenchless technologies for hydraulic infrastructure. The drilling works were completed in just 24 consecutive days, achieving advance rates of up to 70 metres per day.
What were the main characteristics of the drilling works?
The project involved a 690-metre bore for the installation of a 56-inch (1,422 mm) steel pipeline. The alignment started at the shoreline and finished 6 metres beneath the seabed, maintaining precise control of the bore path throughout the installation.
What geological challenges did the project present?
The bore passed through alternating layers of silts, clays and granite, creating particularly demanding ground conditions. These geological variations required continuous adjustment of the drilling parameters and constant monitoring throughout the execution of the works.
Why was Direct Pipe® technology selected?
Direct Pipe® technology allows excavation and the simultaneous installation of the final pipeline in a single continuous operation. For this project, it was the most suitable solution because it minimised environmental impact along the coastline and seabed, reduced the surface footprint and maintained a high level of accuracy throughout the drilling process.